{"id":6353,"date":"2025-07-16T18:58:05","date_gmt":"2025-07-16T22:58:05","guid":{"rendered":"https:\/\/blog.hexagonmining.com\/?p=6353"},"modified":"2025-09-24T16:01:28","modified_gmt":"2025-09-24T20:01:28","slug":"hexagon-mineplan-2025-release-1-is-now-available","status":"publish","type":"post","link":"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/","title":{"rendered":"Hexagon MinePlan 2025 Release 1 is now available!"},"content":{"rendered":"<p>By Kerina Taylor<\/p>\n<p>The mining industry relies heavily on mine planning software to maximise the value of projects throughout the lifecycle of an asset. These software solutions handle everything from drillhole management and geomodelling to resource estimation, scheduling, optimisation, and even fleet management. Hexagon MinePlan 3D is a comprehensive platform that enables geologists and engineers to collaborate seamlessly across their workflows, all within a single connected package. By simplifying complex tasks, ensuring auditability of critical numbers like resource estimates and net present values, and enabling iterative improvements across the mining value chain, MinePlan helps operations unlock hidden value. From optimising schedules to improving ore recovery with blast movement tracking, these incremental gains add up to significant extensions in mine life and profitability.<\/p>\n<p>As the mining industry continues to evolve, Hexagon remains at the forefront of innovation. With a strong focus on customer success, Hexagon delivers customer-centric solutions that empower mines to make better decisions, maximise resource extraction, and minimise their environmental footprint. By bridging the gap between the digital and physical environments, Hexagon\u2019s software ensures that mines can adapt to modern challenges while maintaining efficiency and sustainability. This commitment to advanced technology, trusted partnerships, and exceptional support makes Hexagon a leader in the field and a reliable partner for mines around the world.<\/p>\n<h2>Whats new?<\/h2>\n<p><strong>1. Block Model Manager integrations with MP3D tools<\/strong><\/p>\n<p><strong>2. Enhanced drillhole coding in MP3D viewer<\/strong><\/p>\n<h2><strong>Unlock the future of mining: introducing MinePlan Block Model Manager<\/strong><\/h2>\n<p>Mining operations today are more complex than ever, with decisions relying heavily on accurate, up-to-date data. At the heart of these operations lies the block model\u2014a digital twin of your mineral resources and the single source of truth for both operational and strategic planning. But managing block models has long been a challenge, plagued by inefficiencies, limited version control, and cumbersome data transfers.<\/p>\n<p>That\u2019s why we\u2019re excited to introduce <strong>MinePlan Block Model Manager<\/strong>, a game-changing solution designed to revolutionise how mining professionals manage, access, and utilise block model data.<\/p>\n<h2><strong>The problem: challenges in Block Model Management<\/strong><\/h2>\n<p>Traditional approaches to block model management have significant limitations that can hinder productivity and decision-making:<\/p>\n<ul>\n<li><strong>File inefficiency:<\/strong>\u00a0Block model files are notoriously large and cumbersome to work with.<\/li>\n<li><strong>Version chaos:<\/strong>\u00a0Tracking changes and managing multiple versions is a manual and error-prone process.<\/li>\n<li><strong>Data silos:<\/strong>\u00a0Transferring data between systems often requires manual CSV exports, introducing inefficiencies and risks.<\/li>\n<li><strong>Limited auditing:<\/strong>\u00a0Without robust version control, auditing changes and maintaining a clear history is nearly impossible.<\/li>\n<\/ul>\n<p>These challenges slow down workflows, increase the risk of errors, and make it harder to extract the full value of your data.<\/p>\n<h2><strong>The solution: MinePlan Block Model Manager<\/strong><\/h2>\n<p><strong>MinePlan Block Model Manager<\/strong>\u00a0is purpose-built to address these challenges head-on, offering a modern, scalable, and integrated approach to block model management. Here\u2019s what makes it stand out:<\/p>\n<ul>\n<li><strong>Modern architecture:<\/strong> A three-tier client-server setup with a new storage format and service layer ensures scalability and performance optimisation.<\/li>\n<li><strong>Version control:<\/strong>\u00a0Track every change with full audit trails, restore previous versions, and publish updates effortlessly.<\/li>\n<li><strong>Seamless integration:<\/strong> Connect with MinePlan, Datamine, Vulcan, and CSV sources, while integrating into BI platforms and Hexagon\u2019s solution ecosystem.<\/li>\n<li><strong>API access:<\/strong>\u00a0Securely query only the data you need, enabling custom analytics and applications.<\/li>\n<\/ul>\n<p>By combining cutting-edge technology with user-focused design, MinePlan Block Model Manager empowers mining teams to work smarter, not harder.<\/p>\n<h2><strong>Key capabilities that drive results<\/strong><\/h2>\n<p><strong>MinePlan Block Model Manager<\/strong> is packed with features that deliver real value across your mining operation. Here are just a few of the highlights:<\/p>\n<ul>\n<li><strong>Version-to-Version comparisons:<\/strong>\u00a0Effortlessly compare block model versions to understand changes and impacts.<\/li>\n<li><strong>Enhanced metadata and UX:<\/strong>\u00a0Experience intuitive tools and rich metadata for better decision-making.<\/li>\n<li><strong>Support for all major model types:<\/strong>\u00a0Work seamlessly with any block model, regardless of its origin.<\/li>\n<li><strong>Background conversion and synchronisation:<\/strong>\u00a0Keep your data up to date without interrupting workflows.<\/li>\n<li><strong>Scalable storage:<\/strong> Handle large datasets with ease, ensuring performance never slows you down.<\/li>\n<\/ul>\n<h2><strong>Delivering value across roles<\/strong><\/h2>\n<p><strong>MinePlan Block Model Manager<\/strong> is designed to meet the needs of diverse roles within your mining operation. Here\u2019s how it makes life easier for everyone:<\/p>\n<ul>\n<li><strong>Visualisation:<\/strong> Always access the latest data, filter attributes, and visualise changes in real time.<\/li>\n<li><strong>Reserves:<\/strong>\u00a0Compare reserve outputs across model versions to ensure accuracy and consistency.<\/li>\n<li><strong>Grade control:<\/strong>\u00a0Integrates with\u00a0<strong>Blast Movement Intelligence<\/strong>\u00a0for faster markouts and analysis.<\/li>\n<li><strong>Mid\/Long range planners:<\/strong>\u00a0Accelerate imports and directly integrate with\u00a0<strong>Schedule Optimiser<\/strong>.<\/li>\n<li><strong>Short range planners:<\/strong>\u00a0Improve scheduling workflows with\u00a0<strong>Activity Scheduler<\/strong>\u00a0integration.<\/li>\n<\/ul>\n<p>Whether you\u2019re a geologist, planner, or engineer, MinePlan Block Model Manager delivers the tools you need to make better decisions faster.<\/p>\n<h2><strong>Empowering Business Intelligence and Developers<\/strong><\/h2>\n<p>In addition to improving operational workflows, MinePlan Block Model Manager unlocks new opportunities for business intelligence and developer innovation:<\/p>\n<ul>\n<li><strong>Custom dashboards:<\/strong>\u00a0APIs enable dashboards for tracking grade, distribution, and reserve depletion, providing a clear view of your operation\u2019s performance.<\/li>\n<li><strong>Developer enablement:<\/strong>\u00a0Developers can build custom applications using block model data, creating tailored solutions for unique challenges.<\/li>\n<\/ul>\n<p>With these capabilities, MinePlan Block Model Manager goes beyond traditional software\u2014it becomes a platform for innovation.<\/p>\n<h2><strong>Why it matters: a smarter way to mine<\/strong><\/h2>\n<p>MinePlan Block Model Manager isn\u2019t just a tool\u2014it\u2019s a strategic enabler that helps mining operations overcome inefficiencies, reduce risks, and unlock new levels of performance. By addressing long-standing challenges in block model management, it empowers teams to focus on what matters most: delivering value from the ground up.<\/p>\n<p>Check out the tech tip on Block Model Manager integrations below!<\/p>\n<p><iframe loading=\"lazy\" title=\"YouTube video player\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/iJTSdksO9Z0?si=HxkFrLvzGbKoOwZL\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<h2><strong>Streamlining geological modeling: new features in Drillhole Viewer for 3D object coding<\/strong><\/h2>\n<p>In resource modeling, precision and efficiency are everything. Coding 3D shapes\u2014such as solids, polygons, and surfaces\u2014to drillhole data is a cornerstone of subsurface geological analysis, enabling geologists to define ore zones, estimate resources, and optimise mine plans.<\/p>\n<p>With the latest updates to <strong>Drillhole Viewer<\/strong>, we\u2019ve made the coding process faster, more accurate, and more flexible, empowering geologists to achieve better results with less effort.<\/p>\n<h2><strong>What\u2019s new in Drillhole Viewer?<\/strong><\/h2>\n<ol>\n<li><strong>Code by surface<\/strong><br \/>\nSkip the extra step of creating solids\u2014now you can code drillholes directly from surfaces.<\/p>\n<ul>\n<li><strong>What\u2019s changed:<\/strong>\u00a0Previously, drillhole coding could only be performed using solids or polygons. This update allows users to work directly with surfaces, simplifying workflows and saving time.<\/li>\n<li><strong>Why it matters:<\/strong>\u00a0Surfaces are often used to represent geological boundaries, such as stratigraphic contacts or fault planes. By coding directly from surfaces, geologists can more quickly and accurately model these features without needing to generate additional 3D objects.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Honor polygon intersection for drillhole interval creation<\/strong><br \/>\nCreate new drillhole intervals based on polygon intersections for greater resolution.<\/p>\n<ul>\n<li><strong>What\u2019s changed:<\/strong>\u00a0Previously, only existing intervals could be coded. If a polygon intersected an interval halfway, the resolution of the coding was limited. Now, new intervals can be created wherever polygons intersect drillholes, ensuring higher accuracy.<\/li>\n<li><strong>Why it matters:<\/strong> This feature increases the precision of resource modeling by capturing finer details of mineralisation boundaries. Geologists can now delineate ore zones more accurately, reducing uncertainty and improving confidence in resource estimates.<\/li>\n<\/ul>\n<\/li>\n<li><strong>Spear 3D object intersections<\/strong><br \/>\nPinpoint exact intersection points of 3D objects with drillholes using Torque downhole point coverage.<\/p>\n<ul>\n<li><strong>What\u2019s changed:<\/strong> Instead of coding an entire interval, users can now spear the intersection points of 3D objects to a downhole point coverage in Drillhole Manager.<\/li>\n<li><strong>Why it matters:<\/strong> This feature offers unparalleled precision by recording the exact intersection points of 3D objects with drillholes. It\u2019s especially valuable for communicating important geological boundaries.<\/li>\n<\/ul>\n<\/li>\n<\/ol>\n<h2><strong>How these features enhance geological modeling and deliver value across the mining workflow<\/strong><\/h2>\n<ol>\n<li><strong>Increased Accuracy<\/strong><\/li>\n<li><strong>Improved Efficiency<\/strong><\/li>\n<li><strong>Enhanced Flexibility<\/strong><\/li>\n<\/ol>\n<p>The benefits of these new features extend far beyond the coding process. They empower geologists to deliver better results at every stage of the mining workflow:<\/p>\n<ul>\n<li><strong>Exploration targeting:<\/strong>\u00a0By identifying precise intersections and boundaries, geologists can refine exploration strategies and focus on high-potential areas.<\/li>\n<li><strong>Resource estimation:<\/strong>\u00a0Higher accuracy in coding means more reliable estimates of volume, tonnage, and grade.<\/li>\n<li><strong>Geological interpretation:<\/strong> Improved precision allows for better visualisation and understanding of complex geological features.<\/li>\n<li><strong>Mine planning:<\/strong> Accurate 3D models enable mining engineers to design optimised extraction plans, maximising profitability.<\/li>\n<\/ul>\n<p>Check out the tech tip on drillhole coding below!<\/p>\n<p><iframe loading=\"lazy\" width=\"560\" height=\"315\" src=\"https:\/\/www.youtube-nocookie.com\/embed\/EY2o-nqmCuU?si=bjJf1xUQuF-5ITc0\" title=\"YouTube video player\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<header class=\"post-header cf\"><\/header>\n<div class=\"post-container cf\">\n<div class=\"post-content-right\">\n<div class=\"post-content description \">\n<p><span data-teams=\"true\">Check out\u00a0<a id=\"menur5tq\" class=\"fui-Link ___1q1shib f2hkw1w f3rmtva f1ewtqcl fyind8e f1k6fduh f1w7gpdv fk6fouc fjoy568 figsok6 f1s184ao f1mk8lai fnbmjn9 f1o700av f13mvf36 f1cmlufx f9n3di6 f1ids18y f1tx3yz7 f1deo86v f1eh06m1 f1iescvh fhgqx19 f1olyrje f1p93eir f1nev41a f1h8hb77 f1lqvz6u f10aw75t fsle3fq f17ae5zn\" title=\"https:\/\/community.hexagonmining.com\/\" href=\"https:\/\/community.hexagonmining.com\/\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"Link Hexagon\u2019s Mining division\u2019s Mining Client Community\">Hexagon\u2019s Mining division\u2019s Mining Client Community<\/a>\u00a0for a complete list of updates to Hexagon MinePlan, and to download the latest release.\u00a0<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<p><i><span data-contrast=\"none\">T<\/span><\/i><i><span data-contrast=\"none\">hroughout 2025 we\u2019ll\u202fbe blogging about the challenges facing the mining industry. Drawing upon insights from thought leaders in our customer community and from within Hexagon,\u202fwe\u2019ll\u202fshare how trusted partnerships and proven technology are\u202faddressing those challenges,\u202fhelping to improve\u202fsafety\u202fand cut costs while balancing the demands of productivity and sustainability.<\/span><\/i><\/p>\n","protected":false},"excerpt":{"rendered":"<p>By Kerina Taylor The mining industry relies heavily on mine planning software to maximise the value of projects throughout the lifecycle of an asset. These software solutions handle everything from drillhole management and geomodelling to resource estimation, scheduling, optimisation, and even fleet management. Hexagon MinePlan 3D is a comprehensive platform that enables geologists and engineers<\/p>\n<div class=\"read-more\"><a href=\"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/\" title=\"Read More\">Read More<\/a><\/div>\n","protected":false},"author":61,"featured_media":6354,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[377],"tags":[406,671,663],"class_list":{"0":"post-6353","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-tech-talk","8":"tag-mine-planning","9":"tag-mineplan","10":"tag-planning-update"},"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v21.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Hexagon MinePlan 2025 Release 1 is now available! - Hexagon - Mining Blog<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hexagon MinePlan 2025 Release 1 is now available! - Hexagon - Mining Blog\" \/>\n<meta property=\"og:description\" content=\"By Kerina Taylor The mining industry relies heavily on mine planning software to maximise the value of projects throughout the lifecycle of an asset. These software solutions handle everything from drillhole management and geomodelling to resource estimation, scheduling, optimisation, and even fleet management. Hexagon MinePlan 3D is a comprehensive platform that enables geologists and engineersRead More\" \/>\n<meta property=\"og:url\" content=\"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/\" \/>\n<meta property=\"og:site_name\" content=\"Hexagon - Mining Blog\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-16T22:58:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-24T20:01:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/blog.hexagonmining.com\/wp-content\/uploads\/2025\/07\/A-colorful-lines-on-a-black-background-AI-generated-content-may-be-incorrect_.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"934\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Neville Judd\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Neville Judd\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/\",\"url\":\"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/\",\"name\":\"Hexagon MinePlan 2025 Release 1 is now available! - Hexagon - Mining Blog\",\"isPartOf\":{\"@id\":\"https:\/\/blog.hexagonmining.com\/en\/#website\"},\"datePublished\":\"2025-07-16T22:58:05+00:00\",\"dateModified\":\"2025-09-24T20:01:28+00:00\",\"author\":{\"@id\":\"https:\/\/blog.hexagonmining.com\/en\/#\/schema\/person\/f2e58f1da3a0995be147cef04af207e4\"},\"breadcrumb\":{\"@id\":\"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/blog.hexagonmining.com\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hexagon MinePlan 2025 Release 1 is now available!\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/blog.hexagonmining.com\/en\/#website\",\"url\":\"https:\/\/blog.hexagonmining.com\/en\/\",\"name\":\"Hexagon - Mining Blog\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/blog.hexagonmining.com\/en\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/blog.hexagonmining.com\/en\/#\/schema\/person\/f2e58f1da3a0995be147cef04af207e4\",\"name\":\"Neville Judd\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/blog.hexagonmining.com\/en\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/blog.hexagonmining.com\/wp-content\/uploads\/2018\/05\/Nev_300x400-150x150.jpg\",\"contentUrl\":\"https:\/\/blog.hexagonmining.com\/wp-content\/uploads\/2018\/05\/Nev_300x400-150x150.jpg\",\"caption\":\"Neville Judd\"},\"description\":\"Neville Judd was a journalist for 25 years before becoming manager of content and communications for Hexagon\u2019s Mining division. He is the linchpin for the company\u2019s life-of-mine narrative, sharing stories of customer partnerships and digital transformation.\",\"url\":\"https:\/\/blog.hexagonmining.com\/en\/author\/neville-judd\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hexagon MinePlan 2025 Release 1 is now available! - Hexagon - Mining Blog","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/","og_locale":"en_US","og_type":"article","og_title":"Hexagon MinePlan 2025 Release 1 is now available! - Hexagon - Mining Blog","og_description":"By Kerina Taylor The mining industry relies heavily on mine planning software to maximise the value of projects throughout the lifecycle of an asset. These software solutions handle everything from drillhole management and geomodelling to resource estimation, scheduling, optimisation, and even fleet management. Hexagon MinePlan 3D is a comprehensive platform that enables geologists and engineersRead More","og_url":"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/","og_site_name":"Hexagon - Mining Blog","article_published_time":"2025-07-16T22:58:05+00:00","article_modified_time":"2025-09-24T20:01:28+00:00","og_image":[{"width":934,"height":500,"url":"https:\/\/blog.hexagonmining.com\/wp-content\/uploads\/2025\/07\/A-colorful-lines-on-a-black-background-AI-generated-content-may-be-incorrect_.jpeg","type":"image\/jpeg"}],"author":"Neville Judd","twitter_misc":{"Written by":"Neville Judd","Est. reading time":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/","url":"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/","name":"Hexagon MinePlan 2025 Release 1 is now available! - Hexagon - Mining Blog","isPartOf":{"@id":"https:\/\/blog.hexagonmining.com\/en\/#website"},"datePublished":"2025-07-16T22:58:05+00:00","dateModified":"2025-09-24T20:01:28+00:00","author":{"@id":"https:\/\/blog.hexagonmining.com\/en\/#\/schema\/person\/f2e58f1da3a0995be147cef04af207e4"},"breadcrumb":{"@id":"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/blog.hexagonmining.com\/en\/hexagon-mineplan-2025-release-1-is-now-available\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/blog.hexagonmining.com\/en\/"},{"@type":"ListItem","position":2,"name":"Hexagon MinePlan 2025 Release 1 is now available!"}]},{"@type":"WebSite","@id":"https:\/\/blog.hexagonmining.com\/en\/#website","url":"https:\/\/blog.hexagonmining.com\/en\/","name":"Hexagon - Mining Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/blog.hexagonmining.com\/en\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/blog.hexagonmining.com\/en\/#\/schema\/person\/f2e58f1da3a0995be147cef04af207e4","name":"Neville Judd","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/blog.hexagonmining.com\/en\/#\/schema\/person\/image\/","url":"https:\/\/blog.hexagonmining.com\/wp-content\/uploads\/2018\/05\/Nev_300x400-150x150.jpg","contentUrl":"https:\/\/blog.hexagonmining.com\/wp-content\/uploads\/2018\/05\/Nev_300x400-150x150.jpg","caption":"Neville Judd"},"description":"Neville Judd was a journalist for 25 years before becoming manager of content and communications for Hexagon\u2019s Mining division. He is the linchpin for the company\u2019s life-of-mine narrative, sharing stories of customer partnerships and digital transformation.","url":"https:\/\/blog.hexagonmining.com\/en\/author\/neville-judd\/"}]}},"_links":{"self":[{"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/posts\/6353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/users\/61"}],"replies":[{"embeddable":true,"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/comments?post=6353"}],"version-history":[{"count":0,"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/posts\/6353\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/media\/6354"}],"wp:attachment":[{"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/media?parent=6353"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/categories?post=6353"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blog.hexagonmining.com\/en\/wp-json\/wp\/v2\/tags?post=6353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}